hey guys so quick question if doing a a/b (cybs tek) on mhrb I have in the past when I got to the point of doing the naptha pulls I was told by some of you guys it is ok to stop and pause for the night in between pulls. can I do this between any steps? specificly if I have it at a base solution just about to salt before acidifying is it ok to pause for the day at that point right before salting and acidifying? will it effect quality or yield if pause there? thanks guys